
SHAN
I
INSTALLATION
–
REV 00
FITTING TERMINAL CONVOYER
WARNING: Fit the convoyer (ref. 32) at the centre of the terminal bar top joint with the M8
countersunk screw (ref. 33) (allen wrench 5).
WARNING: Centre the terminal profile with the cassette; keeping the arms aligned, fully tighten the
terminal bar connectors screws into position as shown in the drawing.
INSERTING GASKET AND BRUSH
WARNING: Insert the gasket into the terminal bar and the brush into the cover profile; secure the
latter with the self-drilling screw on both ends (ref. 34).
Summary of Contents for SHAN
Page 1: ...Installation Manual...
Page 2: ......
Page 9: ...7 I SHAN I INSTALLATION REV 00 4 SHAN Technical sheet Fixing bracket...
Page 10: ...8I SHAN I INSTALLATION REV 00 Shan with 2 3 4 arms...
Page 18: ...SHAN Installation manual COUPLED VERSION INTEGRATION...
Page 29: ...NOTES...
Page 30: ...NOTES...