Installing the SP-6 Six Pack
The SP-6 SixPack may be installed in any orientation.
Using the stand bracket.
The fixture is supplied with a stand bracket that can be bolted to a surface using M12 hardware,
or used to fly a single fixture at elevation using clamps or similar. The bracket is not designed to
support the weight of more than one fixture. The angle of the fixture can be adjusted using the tilt
locks at either end of the fixture.
When flying any fixture at elevation, always fasten a safety cable
between the load-bearing support structure and the attachment
point on the device. The safety cable must be able to bear at
least 10 times the weight of the device (see “Specifications” on
page 41). Min. safety wire gauge = 3mm.
WARNING! Always secure an elevated SP-6 SixPack with a safety cable as backup
WARNING! If the device has been operating, always allow it cool for 15 minutes
Summary of Contents for SP-6 SIXPACK
Page 1: ...SP 6 SIXPACK...
Page 2: ...2 SP 6 SixPack dimensions All dimensions in mm Drawing not to scale...
Page 4: ...4...
Page 45: ...45 USER S NOTES...
Page 46: ...46...
Page 47: ...47...