
31/10/2019
VACUUM LEAK DETECTOR
VLXE ..
- 29 -
5.7.5 Double-walled pipe, connected in parallel 2
02 Stop
cock
03 Exhaust
18
Detonation flame arrester
20
Three-way valve, suction line
21
Three-way valve, measuring line
27
Liquid stop valve
27*
Liquid stop valve, connected against the direction of flow
43 Measuring
line
44 Solenoid
valve
57 Test
valve
68 Suction
line
74 Connection
line
82
Nozzle for installation pump
88 Double-walled
pipe
95
Pressure compensation vessel
96 Node
point
Installation
88
68
27
27*
96
74
02
18
95
43
57
< H
max
< H
max
< H
ma
x
bar
bar
bar
20
21
Ex
Ex