35
4
.
5
.
- On the ie wall has the location for the throttle
pusshrod tube (pre-drill).
- Slide the pushrod tube in the iewall and guide it
through the fuel tank mount. Use medium C/A to
glue the tube to the iewall and the fuel tank mount.
- Connect the Z-bend in the 450mm throttle push-
rod to the outer hole of the carburetor arm.
- Slide the throttle pushrod wire into the tube. Po-
sition the engine between the mounts. Use four
M4x30mm machine screws to secure the engine to
the mount as shown.
4x30mm
- Reinstall the servo horn by sliding the connec-
tor over the pushrod wire. Center the throttle stick
and trim and install the servo horn perpendicular
to the servo center line.
- Move the throttle stick to the closed position and
move the carburetor to closed. Use a 2.5mm hex
wrench to tighten the screw that secures the throt-
tle pushrod wire. Make sure to use threadlock on
the screw so it does not vibrate loose.
6
.
COWLING
- Please see below pictures.
1
.
2
.
Summary of Contents for Master P-47D Thunderbolt
Page 3: ...3...
Page 4: ...P 47D hunderbolt 60 Kit 4 Instruction Manual...
Page 5: ...5...
Page 6: ...P 47D hunderbolt 60 Kit 6 Instruction Manual...
Page 7: ...7...
Page 8: ...P 47D hunderbolt 60 Kit 8 Instruction Manual...
Page 12: ...P 47D hunderbolt 60 Kit 12 Instruction Manual 21 22 23 24 25 28 26 27...
Page 13: ...13 31 32 30 33 34 35 36 29...
Page 14: ...P 47D hunderbolt 60 Kit 14 Instruction Manual 37 38 39 40 41 42 43 44...
Page 15: ...15 48 46 49 47 51 52 50 45...
Page 63: ...63 BUILD THE HORIZONTAL STAB 5 9 10 6 7 8 3 4...
Page 79: ...79 Insert fuel tank onto the wings 6 10 11 12 13 7 8 9...
Page 86: ...P 47D hunderbolt 60 Kit 86 Instruction Manual...