![SEW movifit mc Operating Instructions Manual Download Page 38](http://html1.mh-extra.com/html/sew/movifit-mc/movifit-mc_operating-instructions-manual_1249995038.webp)
5
Electrical installation
Installation instructions (all versions)
Operating Instructions – MOVIFIT
®
MC
38
5.3.4
Notes on PE connection and/or equipotential bonding
WARNING
Electric shock due to incorrect connection of PE.
Severe, fatal injuries.
• The permitted tightening torque for the screw is 2.0 to 2.4 Nm
(18 to 21 lb.in)
• Observe the following notes regarding the PE connection:
Prohibited assembly
Recommendation:
Assembly with forked cable lug
Permitted for all cross sections
Assembly with solid connecting
wire
Permitted for cross section up to
max. 2.5 mm
2
9007199577783435
[1]
M5
9007199577775243
2.5 mm²
M5
9007199577779339
[1] Forked cable lug suitable for M5 PE screws
Leakage currents ≥ 3.5 mA can occur during normal operation. To meet the require-
ments of EN 61800-5-1, observe the following notes:
• The protective earth (PE) connection must meet the requirements for plants with
high earth-leakage currents.
• This usually means
– installing a PE connection cable with a minimum cross section of 10 mm
2
– or installing a second PE connection cable in parallel with the original PE con-
nection.
19484828/EN – 01/2015