
66
Assembly and Operating Instructions – Gear Units R..7, F..7, K..7, K..9, S..7, SPIROPLAN® W
4
AD input shaft assembly
Mechanical Installation
4.13
AD input shaft assembly
Observe section "Assembling the input and output components" (page 27) when install-
ing input components.
4.13.1 AD../P – cover with motor mounting platform
Mounting the motor and adjusting the motor mounting platform.
1. Set the motor mounting platform to the required mounting position by evenly tighten-
ing the adjusting nuts. Remove the lifting eyebolt from helical gear units in order to
achieve the lowest adjustment position. Touch up any damage to the paint work.
2. Align the motor on the motor mounting platform (shaft ends must be in alignment)
and secure it.
3. Mount the input elements on the input shaft end and the motor shaft, line them up
with one another and correct the motor position again, if necessary.
4. Put on the traction elements (V-belt, chain, etc.) and apply a preload by evenly ad-
justing the motor mounting platform. Do not stress the motor mounting platform and
the columns against each other when doing this.
5. Tighten all the nuts not used for adjustment in order to fix the threaded columns.
212119307
[1] Motor mounting platform
[2] Stud bolt (only AD6/P / AD7/P)
[3] Support (only AD6/P / AD7/P)
[4] Nut
[5] Threaded column
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com