2.0 INSTALLATION

2.1 Rough-In (see Fig 2.)

Install the SRMD in a 4 11/16” square electrical box. Run the power and signal 
wiring into the box. Two wires are for the 24 VAC/DC power, and two wires are 
for each of the signal lines from the field sensors to the display. For example, 
the single display version would be 2 wires and the dual display needs 2 wires 
for each of the two displays.

Run the wiring to the 24 VAC/DC source and to the sensors that are to be 
monitored. The power to the sensors is not supplied by the displays.

2.2 Positioning the Front of the Electrical Box

It is very important that the box be set 1/16” to 1/8” below the finish wall so 

that the faceplate will seal against the finished 

wall. 

If possible allow for ad-

justment at the finish stage to set the depth correctly.

Fig. 2

Summary of Contents for SRMD

Page 1: ...lue 2 Faceplate Bezel White or Metallic Finish as ordered 3 Engineering units label set Note IfadualdisplayisorderedwithaSRHtemperatureorhumiditysensorandacolorspecifiedtomatch each oryourownsensors w...

Page 2: ...sion would be 2 wires and the dual display needs 2 wires for each of the two displays Run the wiring to the 24 VAC DC source and to the sensors that are to be monitored The power to the sensors is not...

Page 3: ...nal strip If you are using field sensors that are not Setra s SRH humidity temperature sensors then calibrate the display according to Section 4 before completing the wiring shown here Fig 3 Wiring E...

Page 4: ...display 0 to 100 factory default setting Calibration requires a calibrated Voltage Source to simulate the sensor analog output Set range dip switch to either 5 V for a 0 to 5 V input or 10 V for a 0 t...

Page 5: ...tup Humidity Sensor Apply 0 V and if necessary turn the ZERO potentiometer pot until the display reads 0 0 apply 5 VDC and turn the pot labeled 5V until the display reads 100 0 Setup Temperature Senso...

Page 6: ...he depth of the electrical box relative to the finish wall see Fig 2 install the mounting plate to the electrical box Be sure that the displays are installed right side up Install the 2 mounting screw...

Page 7: ...pins with the rubber grommets in the mounting plate Slowly and evenly push the bezel until the back of the bezel is flush against the finish wall Choose the appropriate Engineering unit labels for th...

Page 8: ...r normal installation use and service e SETRA is notified in advance of and the product is returned to SETRA transportation prepaid Unless otherwise specified in a manual or warranty card or agreed to...

Reviews: