4.2 Zero and Span Calibration

Set the Voltage Source to 0 VDC and Connect the Voltage Source to the +S 
and COM terminals on the display.

Check the field sensor input and output specification.

Example:

Humidity Sensor  

 

 

0-100% RH and 0 to 5 VDC output

Temperature Sensor 

 

 

50-90°F and 0 to 10 VDC output

Setup Humidity Sensor:
Apply 0 V and if necessary turn the ZERO potentiometer (pot) until the display 
reads 0.0, apply 5 VDC and turn the pot labeled 5V until the display reads 
100.0

Setup Temperature Sensor:
Move the range jumper from the 5V to 10V position. Apply 0 VDC and turn 
ZERO pot until the display reads 50.0, apply 10V and turn 10V pot until display 
reads 90.0

4.3 Adjust Display Brightness

While looking at the display, turn the Display brightness adjust pot, (See Fig. 4) 
to the desired brightness.

Summary of Contents for SRMD

Page 1: ...lue 2 Faceplate Bezel White or Metallic Finish as ordered 3 Engineering units label set Note IfadualdisplayisorderedwithaSRHtemperatureorhumiditysensorandacolorspecifiedtomatch each oryourownsensors w...

Page 2: ...sion would be 2 wires and the dual display needs 2 wires for each of the two displays Run the wiring to the 24 VAC DC source and to the sensors that are to be monitored The power to the sensors is not...

Page 3: ...nal strip If you are using field sensors that are not Setra s SRH humidity temperature sensors then calibrate the display according to Section 4 before completing the wiring shown here Fig 3 Wiring E...

Page 4: ...display 0 to 100 factory default setting Calibration requires a calibrated Voltage Source to simulate the sensor analog output Set range dip switch to either 5 V for a 0 to 5 V input or 10 V for a 0 t...

Page 5: ...tup Humidity Sensor Apply 0 V and if necessary turn the ZERO potentiometer pot until the display reads 0 0 apply 5 VDC and turn the pot labeled 5V until the display reads 100 0 Setup Temperature Senso...

Page 6: ...he depth of the electrical box relative to the finish wall see Fig 2 install the mounting plate to the electrical box Be sure that the displays are installed right side up Install the 2 mounting screw...

Page 7: ...pins with the rubber grommets in the mounting plate Slowly and evenly push the bezel until the back of the bezel is flush against the finish wall Choose the appropriate Engineering unit labels for th...

Page 8: ...r normal installation use and service e SETRA is notified in advance of and the product is returned to SETRA transportation prepaid Unless otherwise specified in a manual or warranty card or agreed to...

Reviews: