OPERATION
CY72 01/08
Operation Section 4-36
© 2008 Alamo Group Inc.
OPERA
T
ION
Never allow children or other persons to ride on the Tractor or Implement.
Falling off can result in serious injury or death.
(SG-10)
14. TRANSPORTING THE TRACTOR AND IMPLEMENT
Inherent hazards of operating the tractor and implement and the possibility of accidents are not left behind
when you finish working in an area. Therefore, the operator must employ good judgement and safe operation
practices when transporting the tractor and implement between locations. By using good judgement and
following safe transport procedures, the possibility of accidents while moving between locations can be
substantially minimized.
OPS-U- 0017
Before transporting the tractor and mower, idle the
tractor engine, disengage the PTO and wait for all
mower moving parts to come to a complete stop.
Once all mower parts are completely stopped, raise
the mower to transport height.
NOTE:
When
raising the mower, maintain 1” clearance between
the driveline and mower deck. If additional mower
deck height is needed for safe transport, disconnect
the driveline from the tractor and secure its end to
the mower deck. The mower can then be raised to
the maximum lift height.
OPS-R-0033_A
If the tractor’s hydraulic pump is not independent of
the tractor PTO, or if the tractor PTO has to be run
to have hydraulic power, disconnect the mower
driveline from the tractor PTO output shaft. Secure
the driveline to the mower deck to prevent driveline
damage or loss during transport.
OPS-R-0034
14.1 Tire and Wheels
Laminated Sectional Tires
are designed for conditions where puncture proof performance is required and
the mower will not be transported for long distances on roadways. Transport speed for laminated tires should
not exceed 10 MPH. Excessive speed can cause damage to the machine and tire sections. Sectional tires
must be installed such that the rubber segments lay with the ground.
OPS-R-0035_A
Summary of Contents for CY72
Page 7: ...Safety Section 1 1 2008 Alamo Group Inc SAFETY SECTION...
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...Introduction Section 2 1 2008 Alamo Group Inc INTRODUCTION SECTION...
Page 75: ...Assembly Section 3 1 2008 Alamo Group Inc ASSEMBLY SECTION...
Page 83: ...Operation Section 4 1 2008 Alamo Group Inc OPERATION SECTION...
Page 125: ...Maintenance Section 5 1 2008 Alamo Group Inc MAINTENANCE SECTION...
Page 133: ......
Page 136: ...CY 72 SOM 01 08 P N 00757419C Printed U S A CY 72 ROTARY CUTTER...