OPERATION
CY72 01/08
Operation Section 4-21
© 2008 Alamo Group Inc.
OPERA
T
ION
Rotary Mower PRE-OPERATION Inspection
Mower ID#________________
Make ____________________
Date: ________________
Shift ____________________
Before conducting the inspection, make sure the tractor engine is off, all
rotation has stopped and the tractor is in park with the parking brake
engaged. Make sure the mower is resting on the ground or securely blocked
up and all hydraulic pressure has been relieved.
Operator’s Signature:
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The Operator’s Manual is in the canister on the mower
All safety decals are in place and legible
The tongue/hitch connection bolts & pins are tight
There are no cracks in tongue or hitch
The tow chain is secured to the tractor & mower
The hydraulic cylinders pins are tight
There are no leaking or damaged hoses
The mower deck is clear of cut grass and debris
Chain guards/deflectors are in place & in good condition
Driveline/gearbox shields are in good condition
Driveline clutches are in good condition; not frozen
Driveline telescoping members & U-joints are lubricated
Driveline yokes are securely attached to PTO & mower
Gearbox mounting bolts are tight
Gearbox oil is at the proper level
Blade carrier retaining nut is tight
Blades are not chipped, cracked or bent
Blade bolts are tight
Wheel lug nuts are tight
Transport locks are in good condition
DO NOT OPERATE an UNSAFE TRACTOR or MOWER
Summary of Contents for CY72
Page 7: ...Safety Section 1 1 2008 Alamo Group Inc SAFETY SECTION...
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...Introduction Section 2 1 2008 Alamo Group Inc INTRODUCTION SECTION...
Page 75: ...Assembly Section 3 1 2008 Alamo Group Inc ASSEMBLY SECTION...
Page 83: ...Operation Section 4 1 2008 Alamo Group Inc OPERATION SECTION...
Page 125: ...Maintenance Section 5 1 2008 Alamo Group Inc MAINTENANCE SECTION...
Page 133: ......
Page 136: ...CY 72 SOM 01 08 P N 00757419C Printed U S A CY 72 ROTARY CUTTER...