OPERATION
CY72 01/08
Operation Section 4-12
© 2008 Alamo Group Inc.
OPERA
T
ION
Driveline Length Check
7.2 Setting Deck Pitch
To facilitate safe and efficient operation, the mower
should be operated with the deck approximately
3/4” LOWER IN THE FRONT THAN THE REAR.
Operating the mower at this pitch will allow the
mower to cut the grass only once and requires less
work from the tractor. In addition, a more even
distribution of the clippings from the rear of the
mower will be achieved with this deck pitch.
Adjust the leveling rods linking the tongue to the
rear axle until the front of the mower is at least 3/4”
lower in the front that than the rear. To lower the
front, lengthen the leveling rods and to raise the
front shorten the leveling rods.
IMPORTANT:
Adjust the leveling rods the same amount and maintain equal
tension in the rods. Improper adjustment may cause rods to snap or bend. Retighten the jamnuts after the
deck pitch has been set.
OPS-R-0002
8. DRIVELINE ATTACHMENT
The driveline yoke and tractor PTO shaft must be
dirt free and greased for attachment.
To connect the mower driveline to the tractor
PTO output shaft, pull the driveline yoke collar
back and align the grooves and splines of the
yoke with those of the PTO shaft. Push the
driveline yoke onto the PTO shaft, release the
locking collar, and position the yoke until the
locking collar balls are seated onto the PTO
shaft. Push and pull the driveline back and forth
several times to ensure a secure attachment.
After the driveline is securely attached, place the
tractor PTO master shield back in the operating position.
OPS-R-0003
When attaching the Implement input driveline to the Tractor PTO, it is important that the
connecting yoke spring activated locking collar slides freely and the locking balls are seated
securely in the groove on the Tractor PTO shaft. A driveline not attached correctly to the
Tractor PTO shaft could come loose and result in personal injury and damage to the
Implement.
(S3PT-17)
Summary of Contents for CY72
Page 7: ...Safety Section 1 1 2008 Alamo Group Inc SAFETY SECTION...
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...Introduction Section 2 1 2008 Alamo Group Inc INTRODUCTION SECTION...
Page 75: ...Assembly Section 3 1 2008 Alamo Group Inc ASSEMBLY SECTION...
Page 83: ...Operation Section 4 1 2008 Alamo Group Inc OPERATION SECTION...
Page 125: ...Maintenance Section 5 1 2008 Alamo Group Inc MAINTENANCE SECTION...
Page 133: ......
Page 136: ...CY 72 SOM 01 08 P N 00757419C Printed U S A CY 72 ROTARY CUTTER...