22
Appendix A: Basic Integration Guidelines
DUG-10009-01
RTM II FlexNet User Guide
2.
Once your holes are drilled, use 4 bolt/nut pairs to secure the RTM II to the IED enclosure.
We recommend 4-40 x 3/8-inch pan bolt and Size 4 kepnuts.
Below are drawings of the RTM II dimensions, connector locations, and a drill hole diagram.
RTM II Mounting Hole
Footprint
Summary of Contents for RTM II FlexNet
Page 1: ...RTM II FlexNet Revision 1 DUG 10009 01 ...
Page 6: ...vi Compliance Statements Document Number Document Name ...
Page 14: ...6 Chapter 1 Introduction DUG 10009 01 RTM II FlexNet User Guide ...
Page 16: ...8 Chapter 2 Commissioning Devices on AutomationControl DUG 10009 01 RTM II FlexNet User Guide ...
Page 22: ...14 Chapter 3 Installing the RTM II DUG 10009 01 RTM II FlexNet User Guide ...
Page 36: ...28 Appendix A Basic Integration Guidelines DUG 10009 01 RTM II FlexNet User Guide ...
Page 41: ...Appendix C Hardware Specifications 33 RTM II FlexNet User Guide DUG 10009 01 ...
Page 42: ...34 Appendix C Hardware Specifications DUG 10009 01 RTM II FlexNet User Guide ...