Page 18
12NP Manual
NP Control Board Pinout
An additional switch may be installed as an optional way to enable the inverter. Enable remote operation by
installing a switch between between the pin 4 and 6. The installed switch must be rated for 80 V minimum.
Figure 9 Pinout
Board Pinout
ACC / Remote
(RJ12)
PIN 1 & 3
Digital Ground
PIN 2
CAN-H
PIN 4
(Output, DC Power Fused at 2 Amps)
PIN 5
CAN-L
PIN 6
Inverter Request (Input)
Battery
Temperature
Sensor (RJ12)
PIN 1
N/C
PIN 2 & 5
Sensor Signal Input
PIN 3
Sensor Ground
PIN 4 & 6
N/C
CAN Bus (DB9)
PIN 1, 4, 5, 6, 8, & 9
N/C
PIN 2
CAN-L
PIN 3
CAN REF, GND (N/C)
PIN 7
CAN-H
SYNC/STACK
(RJ45) - Not Yet
Supported
PIN 1 & 2
Digital Communication
PIN 3 & 4
N/C (Not Connected)
PIN 5 & 6
Digital Communication
PIN 7
N/C
PIN 8
Inverter Request (Output)
Table 3 Pinout
GND
CAN H
GND
CAN L
V
batt
Inverter
Request
ACC Jack
1 2 3 4 5 6