15
Selectronic Australia
Rev 41 - Dec 2022
Installation
Cabling and Fusing
Battery Cabling Requirements
The follow tables specify the minimum recommended copper battery cable sizes for SP PRO
inverter. Please ensure the battery cabling and the fusing complies with relevant safety standards.
Total distance per
conductor from the
SP PRO to the
battery terminals
Minimum size copper battery cables per inverter
Based on Cable Loss <2% (V90 or V-90HT insulation)
SPMC240 SPMC241
SPMC480 SPMC481
SPMC482 SPMC1201 SPLC1200
SPLC1202
<2m
70mm
2
70mm
2
35mm
2
50mm
2
70mm
2
35mm
2
70mm
2
2-5m
70mm
2
50mm
2
x2
50mm
2
50mm
2
70mm
2
35mm
2
70mm
2
5-10m
N / A
N / A
70mm
2
70mm
2
70mm
2
x2
50mm
2
70mm
2
>10m
N / A – not recommended
Battery Sense
1.0mm
2
or greater, double insulated (see note)
V90 or V90HT insulated cables are required to be spaced apart by at least the diameter of the
cable. For cables with higher grade insulation, no spacing is required. The maximum temperature
rating of the cabling within the unit needs to be considered. Maximum temperature with cabling
space is a30°C.
The DC terminals within the SPMC and SPLC models will take up to a 95mm
2
flexible battery cable.
In a Powerchain installation, the total battery cable rating is multiplied by the number of inverters in
the system. For example, in a three-phase installation using three SPMC482 inverters, the minimum
battery cable size with a length of 2m–5m is 3 x 70mm
2
or equivalent.
Failure to follow cable size recommendations will reduce inverter performance to the published
specifications due to excessive voltage drops. Battery Sense / pre-charge cable
must
be robust with
solid insulation.
Do not
use CAT5 or equivalent cable.
Battery Fusing / Circuit Breakers
Recommended battery fuse or circuit breaker sizes per SP PRO inverter.
The following recommendations
must
be adhered to for correct system operation.
Failure to follow the fuse / circuit breaker recommendations WILL lead to loss of power.
Product
SPMC240
SPMC241
SPMC480
SPMC481
SPMC482
SPMC1201
SPLC1200
SPLC1202
Battery fuse /
circuit breaker -
rating per inverter (A)
250
250
125
160
250
125
250
Battery Sense
2A or greater (sized to protect wiring)
The DC breaking capacity (normally specified in kA at a maximum DC voltage) of the fuse or circuit
breaker must be greater than the maximum DC short circuit current for the site’s connected battery
system.
In a Powerchain installation, the total battery fuse / circuit breaker rating is multiplied by the number of
inverters in the system. For example, in a three-phase installation using three SPMC482 inverters, the battery
fuse size is 3 x 250A = 750A.
Alternatively, each SP PRO maybe wired individually with their own battery circuit. In this case, use the cable
size and battery fuse / circuit breaker ratings shown in the above tables.
Cabling and Fusing