
Section 7: Valve Maintenance
MAX Valve Repair and Replacement
2016 Bambi MAX Service Manual
–
Models 1518-3542
(Version E)
35
We Engineer Solutions
Bottom Seal Replacement
Tools required: Ratchet 1/4", drive extension short socket 5/16" or slot screwdriver.
1.
To make the valve more stable, open the valve
until the top of the tube is level with the top of the
motor and cut the power to keep it in this location.
If you have several Bambi MAX buckets, a Power
Pack is available from SEI. This Power Pack can
also be used as the main power source for
operation of the bucket which eliminates wiring
the helicopter for the Bambi MAX.
2.
Turn valve over, as shown in this picture.
Valve in partially open position and shown
with the Bambi Power Pack.