40
ASSEMBL
Y AND
INST
ALLA
TION
6
6
**215
M8x25 SKT BH BLK (2 per)
**202
M8 WSHR SPR PAS (2 per)
**203
M8 WSHR 22OD FLT PAS (2 per)
[029-B00825]
[060-S00800]
[068-852216-0B]
1
Remove the (5) Sets of fixings from each of the ROOF SUPPORT MAIN L and ROOF SUPPORT MAIN R.
There will be a total of 20 sets of fixings.
2
Unscrew (4) M8X40 SKT BH PAS screws along with their washers from the base of both MONITOR
CABIs. Apply the (2) BKT JOINT FLOOR MON CABI UNDER (taken from previous step) to each
MONITOR CABI as shown.
X4
1
2
3
4
**15
ROOF SUPPORT MAIN TNX L (2)
**16
ROOF SUPPORT MAIN TNX R (2)
[MI-0011UK]
[MI-0012UK]
**16
ROOF SUPPORT MAIN TNX R (2)
[MI-0012UK]
**15
ROOF SUPPORT MAIN TNX L (2)
[MI-0011UK]
**215
M8x25 SKT BH BLK (5 per)
**202
M8 WSHR SPR PAS (5 per)
**203
M8 WSHR 22OD FLT PAS (5 per)
[029-B00825]
[060-S00800]
[068-852216-0B]
6-2-3
ROOF SUPPORTS
Summary of Contents for MISSION IMPOSSIBLE ARCADE
Page 126: ...VIDEO DISPLAY 115 11 OSD Structure...
Page 127: ...116 VIDEO DISPLAY 11 Picture Menu VGA Settings Menu Setup Menu Colour Menu...
Page 128: ...VIDEO DISPLAY 117 11 User Colour Menu Input Menu OSD Menu OSD Position Menu...
Page 129: ...118 VIDEO DISPLAY 11 Info Menu Advance Setup Menu...
Page 140: ...LAMPS AND LIGHTING 13 129...
Page 141: ...13 LAMPS AND LIGHTING 130 13 2 LED LIGHTING STEP...
Page 142: ...LAMPS AND LIGHTING 13 131 13 3 LED LIGHTING OUTER CURVE...
Page 143: ...13 LAMPS AND LIGHTING 132 13 4 LED LIGHTING INNER CURVE...
Page 144: ...LAMPS AND LIGHTING 13 133 13 5 LED LIGHTING CONTROL PANEL...
Page 145: ...13 LAMPS AND LIGHTING 134 13 6 LED LIGHTING CONTROLLER...
Page 146: ...LAMPS AND LIGHTING 13 135 13 7 LED LIGHTING WOOFER...
Page 147: ...13 LAMPS AND LIGHTING 136 13 8 LED LIGHTING BILLBOARDS...
Page 148: ...LAMPS AND LIGHTING 13 137 13 9 PASSIVE INFA RED PIR...