18
ASSEMBL
Y AND
INST
ALLA
TION
6
2
Using a step and 2 people, offer the ASSY BILLBOARD up to the cabinet. Connect the harness for the
BILLBOARD LEDS making sure that the harness is positioned behind the cabinet frame.
3
Once the ASSY BILLBOARD is located firmly into position secure it by fitting (2) M8x20 SKT CAP with
M8 SPR WSH ans M8 FLT
4
Fit and secure (1) M8x50 SKT CAP, M8 SPR WSH, M8 FLT WSHR to the underside of the BILLBOARD.
Billboard Harness
020-F00820-0Z - M8X20 SKT CSK 0Z (2)
060-S00800 M8 WSHR SPR PAS (2)
068-852216-0B M8 WSHR 22OD FLT BLK (2)
020-F00850-0Z - M8X50 SKT CSK 0Z (1)
060-S00800 M8 WSHR SPR PAS (1)
068-852216-0B M8 WSHR 22OD FLT BLK (1)
Summary of Contents for Double Spin
Page 12: ...HANDLING PRECAUTIONS 3 1 ...
Page 28: ...ASSEMBLY AND INSTALLATION 19 6 5 Refit the BACK PANEL M6X25 SKT CAP BLK 8 ...
Page 73: ...64 COIN HANDLING 12 STERLING PRICE OF PLAY SETTINGS SW1 ...
Page 74: ...COIN HANDLING 65 12 EURO PRICE OF PLAY SETTINGS SW1 ...
Page 124: ...115 WIRING DIAGRAMS 20 D 1 5 20 WIRING DIAGRAMS ...
Page 125: ...116 WIRING DIAGRAMS 20 D 2 5 ...
Page 126: ...117 WIRING DIAGRAMS 20 D 3 5 ...
Page 127: ...118 WIRING DIAGRAMS 20 D 4 5 ...
Page 128: ...119 WIRING DIAGRAMS 20 D 5 5 ...