43
www.seuservice.com
C. OUTPUT TEST
Selecting the OUTPUT TEST displays the following screen on the monitor. The condition of
each lamp and motor can be checked.
OUTPUT TEST
START LAMP
OFF
VIEW LAMP
OFF
HORN LAMP
OFF
ROLL LEFT
OFF
ROLL RIGHT
OFF
->EXIT
SELECT WITH SERVICE BUTTON
AND PRESS TEST BUTTON
•
Bring the arrow to the desired item and press the TEST button. The display next to the item
changes to ON from OFF, the lamp lights up, and the motor functions.
LAMP item
: If the lamp lights up, operation is satisfactory.
ROLL LEFT
: If the motor moves so as to turn the steering wheel counterclockwise,
operation is satisfactory.
ROLL RIGHT : If the motor moves so as to turn the steering wheel clockwise,
operation is satisfactory.
•
Bring the arrow to EXIT and press the TEST button to return to the MENU screen.
Summary of Contents for 18 Wheeler American Pro Trucker
Page 99: ...95 www seuservice com 1 TOP ASSY PTR DX D 1 2 Inside the door Position of...
Page 105: ...101 www seuservice com 6 ASSY MAIN CABINET PTR 1000 D 1 4...
Page 106: ...102 www seuservice com 6 ASSY MAIN CABINET PTR 1000 D 2 4...
Page 109: ...105 www seuservice com ASSY STEERING UNIT...
Page 110: ...106 www seuservice com ASSY HANDLE MECHA...
Page 111: ...107 www seuservice com 7 ASSY SUB CABI PTR 1100 D 1 3...
Page 118: ...114 www seuservice com 12 AC UNIT PTR 1060 D 1 2...
Page 120: ...116 www seuservice com 13 ASSY PILLAR L PTR 1070 D 1 2...
Page 122: ...118 www seuservice com 14 ASSY PILLAR R PTR 1075 D 1 2...
Page 125: ...121 www seuservice com 16 ASSY COINCHUTE TOWER PTR 1200 D 1 2...
Page 128: ...124 www seuservice com 18 ASSY MAIN BILLBOARD PTR 1500 D 1 2 OPPOSITE SIDE...
Page 130: ...126 www seuservice com 19 ASSY HIGH LOW BACK SHIFTER PTR 2100 D 1 2 For EARTH...
Page 132: ...128 www seuservice com 20 ASSY ACCEL BRAKE SPG 2200 D 1 2...
Page 146: ......