Smart Positioner
SP760 Series
Ver 1.0 SHINHWA Eng.
- 23 -
3-4-2 R
otary Positioner installation steps
Actuator
Up / Down
bracket
① Connect up/down bracket assembles
onto an actuator with bolts. Note the
positioner manufacturer doses not
supply bolts to fix an actuator
.
Counter clock and
clock direction
② With an actuator's initial start point
of 0%, install the fork lever as seen
in figure according to the rotation
direction of stem. Make sure the
installation degrees of fork lever
should be 45 degree from the
horizontal line.
Set of Fork Lever
assembly height
③ If fork lever position is set, tighten
the nuts, which is assembled with the
lower parts of fork lever to an
actuator stem firmly. At the moment,
the fork lever upper side and the
upper bracket's distance should be
19 to 25 mm each other.
④ Attach the positioner onto upper
bracket and fix it with bolts.
At this moment, insert the pin on
the lower part of the fork lever
into the hole of fork lever so that
it may be centered.
When tightening bolts, do not connect
one bolt firmly and after loosing
4 pcs of bolt slightly and
after checking positioner's condition,
connect bracket completely.
Summary of Contents for SP760 Series
Page 14: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 13 2 9 Structure Figure 2 4 Schematic View...
Page 16: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 15 Figure 2 6 SP760 Lever Type...
Page 17: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 16 Figure 2 7 SP760 Fork Lever Type...
Page 18: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 17 Figure 2 8 SP760 Namur Type...
Page 40: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 39 9 LCD OPERATION MAP...