![Seg SP760 Series Instruction Manual Download Page 21](http://html1.mh-extra.com/html/seg/sp760-series/sp760-series_instruction-manual_1233493021.webp)
Smart Positioner
SP760 Series
Ver 1.0 SHINHWA Eng.
- 20 -
④ Connection bar located on actuator clamp should be inserted into spring position on
feed back lever's hole as seen as figure.
⑤ Check whether positioner feedback lever is levelled at valve 50% stroke.
Unless it is levelled, adjust it horizontally after moving a bracket or positioner body.
Figure 3-3 : SP760 positioner installation in actuator
Figure 3-4 : Insert connection bar between lever and lever spring
correctly.
Summary of Contents for SP760 Series
Page 14: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 13 2 9 Structure Figure 2 4 Schematic View...
Page 16: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 15 Figure 2 6 SP760 Lever Type...
Page 17: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 16 Figure 2 7 SP760 Fork Lever Type...
Page 18: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 17 Figure 2 8 SP760 Namur Type...
Page 40: ...Smart Positioner SP760 Series Ver 1 0 SHINHWA Eng 39 9 LCD OPERATION MAP...