BRAEMAR RPCQi EVAPORATIVE COOLERS INSTALLATION MANUAL
|
3
Side & Top Discharge Models
These units are required to be mounted onto a level platform
and must be strong enough to support the unit under operating
and prevailing conditions.
Inside these units will be a flexible connector kit intended to be
fitted on site to allow better alignment to duct work.
IMPORTANT
Installation must be in accordance with Municipal Building
Regulations, Relevant Electrical Wiring Regulations, and any
other relevant Codes and Regulations.
All installation work to be carried out by Authorized Persons
only.
CONVEYING THE COOLER TO THE ROOF
Lifting and installing the cooler is made easier by removing the
pad frames first. They can be replaced at the very end of the
installation procedure.
Do not slide the cooler, lift and carry it. It is recommended
that at least 2 people carry the cooler whenever it needs to be
moved. Do not drop the cooler. Always handle with care.
Important!
For lifting or pulling purposes when using ropes or
slings, always apply the ropes around fan housing. Never tie
them to any or all of the 4 corner pillars.
WARNING!
Take care that the ends of ladders, etc. don’t
penetrate into the opening of the cooler,
CAUTION!
Never try to raise the cooler to the roof alone.
MOUNTING THE COOLER
Down Discharge Models
These units have been designed to be directly mounted on top
of a suitably sized and strengthened metal duct. Fixing is by
means of self drilling screws or rivets through the steel mount
on the bottom of unit to metal duct.
ILL3002
ILL3004