
GT-3-1 activities performed at the installation site
45
10.7
Programming the GT-3-1
This step involves sending the GT-3-1 configuration data from the computer to the
GT-3-1.
You may have already performed this step during preparations in the office. This was
necessary to be able to test whether the mobile connection functions there. This step
must be repeated to ensure that the latest configuration data have been sent to the
GT-3-1 and the loggers. In addition, the measurement period for the connected devices
is set.
Proceed as follows to program the GT-3-1:
Step Description
1
Mark the GT-3-1 in the directory tree of the SebaDataView-3 software.
2
Click on
Program
in the menu bar.
Result:
The window for input of the configuration data opens.
3
If this GT-3-1 was already created and programmed during preparations in the
office, then now check the data displayed, and make any changes necessary.
If this GT-3-1 was only recently created and has not been programmed, now
enter the required configuration data.
4
In the
Measurement settings
segment, specify from when until when on each
Active day the GT-3-1 should measure and record the leak noise.
5
Click on
Program
at the bottom right of the window.
Result:
The configuration data are then sent to the GT-3-1 by the computer.
After completing the process, a dialogue window appears. You will be asked
whether you would like to continue with the next step directly which is “linking”
the GT-3-1 to the loggers.
If you answer YES, the “linking” process starts immediately.
If you want to perform the “linking” later, answer NO.
Introduction
Procedure
Summary of Contents for KMT Sebalog GT-3-1
Page 2: ...Consultation with SebaKMT 2 ...
Page 20: ...Data security 20 ...
Page 22: ...First use 22 ...
Page 26: ...Inserting the SIM card changing the battery 26 ...