© 2012 SeaStar Solutions
Optimus Operations Manual, Rev. D
2-2
2.3 Optimus EPS Single Station System Diagram
Figure 2-1. Optimus EPS system diagram, single station.
RUN
OFF
CAN1 NETWORK
CAN2 NETWORK
PCM
HELM
COLOR
CANtrak
BUZZER
SERVICE PORT
ENGINE GATEWAY
12 VOLT POWER
CA
N3
N
E
T
W
O
R
K
N
M
E
A
2000
AUTOPILOT CCU
POWER
STEERING
PUMP
HYDRAULIC
HOSE
HYDRAULIC
HOSE
SWITCH PANEL
SMART
CYLINDER
SMART
CYLINDER
POWER
STEERING
PUMP
P S
BL
A
C
K
GR
E
Y
PU
R
PLE
RED
COMPONENTS NOT SUPPLIED
BY SEASTAR SOLUTIONS
BREAKERS
PORT
POWER
SOURCE
STARBOARD
POWER
SOURCE
Summary of Contents for OPTIMUS EPS
Page 4: ...2012 SeaStar Solutions Optimus Operations Manual Rev D ii This page left intentionally blank...
Page 14: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 2 4 This page left intentionally blank...
Page 24: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 3 10 This page left intentionally blank...
Page 34: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 5 8 This page left intentionally blank...
Page 44: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 6 10 This page left intentionally blank...
Page 48: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 8 2 This page left intentionally blank...
Page 50: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 9 2 This page left intentionally blank...
Page 52: ...2012 SeaStar Solutions Optimus Operations Manual Rev D 10 2 This page left intentionally blank...
Page 55: ......