Latest products and information available at www.sealite.com
10
SL07, SLC310 & SLC410
Compact 3-5nm+ Solar Marine Lanterns
Charging the Battery
New lanterns should be left in the sun for 1-2 days to ensure battery is charged before placing in
service. Please note, lantern will re-charge even when toggle switch is turned to ‘OFF’ position.
Preferred Installation Location
For best lantern performance, ensure solar modules are not covered and are in clear view of
the sky with no shadows.
Lantern Operation
Lantern is activated by connecting the battery terminals. Flash setting needs to be set prior to activation.
1. Remove the four socket-head screws on the top lens assembly and open.
2. Remove the bung in the base of the light head.
3. Adjust the Intensity setting using the DIP switches (detailed below)
4. Adjust the rotary switches (A and B) to desired flash setting (see ‘Selecting a Flash Code’ section of
this manual).
5. Replace the bung in the base of the light head.
6. Connect the 4-pin connector together to power up the unit.
7. The unit is now ready for normal operation, once placed in darkness.
8. Close the light head, and replace 4 socket head screws.
9. To test place dark cover (towel or jacket) on top of light to activate sensor, light will come on within one
minute.
10. Ensure that the unit is bolted to an even, flat surface.
Installation of SLC310 & SLC410 Models
Item
Description
Quantity
1
SLC310 / SLC410 Base
1
2
SLC310 / SLC410 Lens
Assembly
1
3
Battery 12v 12Ah
1
4
Battery Clamp
1
5
Washer M4
2
6
M4 Cap Screw
2
7
O-Ring, ID 145 x 4.0
1
8
Socket Head Screw M6 x 20
4
9
Mounting Insert
6
Fig 2. SLC310 / SLC410
Solar Marine
Lantern components