C B S - 8 8 0 I N S T R U C T I O N M A N U A L
8
Operating Your Band Sealer
Important
Read this manual carefully, and make it available to everyone connected with the supervision, maintenance,
or production of this machine. Additional copies are available at your request. (Contact your distributor for
this information.) Be very careful when operating, adjusting, or servicing this equipment. If in doubt, stop
and obtain qualified help before proceeding.
Installation
Place the band sealer in the desired location with the required electrical power source available. (See power
requirements.) Make certain that proper electrical wiring is provided to guard against low voltage. If the
voltage is too low, the equipment will not function properly.
Finding the proper location is a most important function of the initial set-up. One must take several factors
into consideration:
Adequate power source
Relationship to source of product
Relationship to band sealer
Relationship to any conveyors necessary to remove finished product
Convenience of operator
Initial Set-up
If you have not already done so, please unpack your machine, carefully checking the contents against the
spare parts list (See Spare Parts List on page 39). Once you have determined that all of the parts have arrived
in good order set up can proceed. If any parts are missing or appear to be damaged, please notify your
distributor or Sealer Sales AND your freight company at once.
To prevent damage to the band sealer, the band sealer body and conveyor are shipped disconnected. Please
follow these simple steps to connect the drive shaft
(Figure 34, Item #17)
on the band sealer body with the
conveyor middle post
(Figure 40, Items #5, 14-18)
on the band sealer conveyor.
Please disregard if you
purchased the CBS-880II vertical band sealer and follow the vertical configuration set up
instructions.
1.
Loosen the knobs for the conveyor table to move the conveyor table forward.
Summary of Contents for CBS-880 I
Page 1: ...C Continuous Band Sealer Instruction Manual Distributed By Version 2 6 Last Updated 2 13 2019...
Page 10: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 6 Getting to Know your Band Sealer...
Page 27: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 23...
Page 28: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 24 Figure 34 Spare Parts Diagram Overview...
Page 30: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 26 Figure 36 Heating Cooling Blocks...
Page 32: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 28 Figure 38 Gears...
Page 34: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 30 Figure 40 Conveyor Table...
Page 37: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 33...
Page 38: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 34 Figure 43 Sealer Body...
Page 45: ...41...