INSTALLATION
MANUAL
Product:
Document
#:
Rev:
Page:
MODEL
5500
GYRO
90214
2
14
of
17
Section
2:
ELECTRICAL
INSTALLATION
2.5
Second
Operator
Station
Connection
This
section
explains
how
to
connect
the
2
nd
Operator
Station
Kit.
Reference
Drawings
90238
2
nd
Operator
Station
Kit
90150
Cable
Block
Diagram
with
2
Operator
Stations
1.
DETERMINE
LOCATION
OF
2
ND
OPERATOR
STATION
a.
The
desired
location
of
the
2
nd
Operator
Station
must
be
determined
with
respect
to
the
1
st
Operator
Station
and
the
vessel
arrangement.
b.
Typical
locations
include:
i.
Flybridge
ii.
Engine
room
2.
DETERMINE
CABLING
ARRANGEMENT
a.
Figure
18
below
shows
the
entire
serial
communications
link
for
2
Operator
Stations.
The
Serial
Comms
Terminator
must
be
installed
on
the
Serial
Comms
6
‐
Way
Connection
Box
farthest
from
the
Gyro
Control
Box.
FIGURE
18
–
CABLING
FOR
2
OPERATOR
STATIONS
b.
The
Operator
Station
nearest
the
Gyro
Control
Box
should
be
connected
to
CABLE
5.
Summary of Contents for 5500 GYRO
Page 1: ...Rev 2 JULY 2013 INSTALLATION MANUAL MODEL 5500 GYRO...
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 20: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 44: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 58: ...THIS PAGE INTENTIONALLY LEFT BLANK...