PC-9
Instruction Manual.
10
Install the pushrod wire as shown.
Adjustable
Connector.
Slide one 60mm diameter wheel collar onto
the axle and tighten. Slide the nose wheel on
and push it up against the wheel collar. Slide
the remaining wheel collar on and push it up
against the wheel and tighten the set screw.
The wheels should spin free and not bind in
any way.
INSTALLING THE NOSE GEAR WHEEL.
1) Using a modeling knife, carefully cut
off the rear portion of
one
of the two nylon tubes
leaving 1/2” protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line (not included) to 2-1/4” long.
Connect one end of the line to the weighted
fuel pickup and the other end to the nylon
pickup tube.
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.
INSTALLING THE STOPPER ASSEMBLY.
FUEL TANK.