2. Wall sleeve location
When making the wall opening, please observe the following requirements:
•
The air inlet and outlet should be unblocked so the air can be delivered to every
corner of the room.
•
Install the unit in a location that is away from heat sources or sources of
inflammable gases.
•
Install the unit in a location that is not directly exposed to sunlight.
•
Do not install the unit in places that are subject to strong wind or dust.
•
There should be sufficient space margins around the unit to facilitate maintenance
and repairs (refer to Figs. 2 and 3)
Critical Dimensions
Note: Care should be taken in locating the electrical supply entry in relation to the
sleeve for later access.
Chart 1
3. Preparation of the wall
The sleeve should be installed during construction and lintels should be used to
support the block above the wall sleeve. The sleeve can not support the load of
bricks/blocks.
For existing construction, the wall opening must be created, and the proper
dimensions are necessary to avoid use of fillers or additional framing. The sleeve is
modular in height and width (refer to Fig 4 & Chart 2).
Summary of Contents for PTAC09CH3ZX
Page 19: ...950 0094 revA 19 26 February 2008 SCHEMATIC DIAGRAMS PTACC9CH3ZX ...
Page 20: ...950 0094 revA 20 26 February 2008 PTAC09HP3ZX ...
Page 21: ...950 0094 revA 21 26 February 2008 PTAC12CH3ZX ...
Page 22: ...950 0094 revA 22 26 February 2008 PTAC12CH5ZX ...
Page 23: ...950 0094 revA 23 26 February 2008 PTACHP3ZX ...
Page 24: ...950 0094 revA 24 26 February 2008 PTAC15CH3ZX ...
Page 25: ...950 0094 revA 25 26 February 2008 PTAC15CH5ZX ...
Page 26: ...950 0094 revA 26 26 February 2008 PTAC15HZ3ZX ...