ST144-21 C/Ku-Band TVRO
Installation
3-19
4.
Use wedges to lift the upper panels off
of the lower panels about ½ inch.
5.
Install a good bead of caulking
between the bottom of the upper
panels and the top of the lower panels,
remove the wedges and radome lifting
brackets, then firmly tighten all the
bolts.
6.
Remove the tape from the upper and
lower panels. All tape should now be
removed from the radome.
7.
The ADE Assembly is now
complete, ready for web straps to
be attached for lifting the ADE
onto the ship.
3.4.6.
Refer to the Base Frame Assembly drawing for your system and the procedure below.
Prepare the 168” Radome ADE for Lift
WARNING:
Hoisting with other than a webbed four-part sling may result in catastrophic crushing
of the radome. Refer to the specifications and drawings for the fully assembled weight of your
model Antenna/Radome and assure that equipment used to lift/hoist this system is rated
accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject to large swaying
motions if hoisted under windy conditions. Always ensure that tag lines, attached to the radome
base frame, are attended while the antenna assembly is being hoisted to its assigned location
aboard ship.
Summary of Contents for ST144-21
Page 6: ......
Page 14: ...Introduction ST144 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Page 22: ...Site Survey ST144 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Page 52: ...Setup Ships Gyro Compass ST144 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Page 60: ...Setup Home Flag Offset ST144 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Page 68: ...Setup Searching ST144 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Page 112: ...Model ST144 21 Drawings ST144 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Page 117: ......
Page 120: ......
Page 122: ......
Page 124: ......
Page 125: ......
Page 138: ......
Page 139: ......
Page 140: ......