Installation
ST144-21 C/Ku-Band TVRO
3-10
22.
To provide a clean caulked
seam all around the panels:
apply painters masking tape
to the outside perimeter of
each of the panels about ¼ “
from the top, bottom, left and
right edges at each flange
joint. The tape will be
removed just before the
radome caulking has had time
to set.
23.
Open each seam wide enough
to install a good bead of
silicone caulk, apply loctite to
and firmly tighten all of the
bolts in that seam (Smaller
beads of caulking can be
applied from outside and
inside if you prefer).
24.
Clean excess caulking off of
the flange area (inside and
out) like was done in step 11
above.
25.
Repeat caulking, closing and
cleaning the vertical flanges
until all of the upper panel
seams are closed.
26.
Remove tape from the vertical
seams.
Summary of Contents for ST144-21
Page 6: ......
Page 14: ...Introduction ST144 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank ...
Page 22: ...Site Survey ST144 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank ...
Page 52: ...Setup Ships Gyro Compass ST144 21 C Ku Band TVRO 5 2 This Page Intentionally Left Blank ...
Page 60: ...Setup Home Flag Offset ST144 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank ...
Page 68: ...Setup Searching ST144 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank ...
Page 112: ...Model ST144 21 Drawings ST144 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank ...
Page 117: ......
Page 120: ......
Page 122: ......
Page 124: ......
Page 125: ......
Page 138: ......
Page 139: ......
Page 140: ......