Procedure, Radome Strain Relief Installation
Page 4 of 6
Document No
131226 Rev A
Form # 117140-B
Fig. 5 – Outside view.
4.9
Rotate General Assembly (G.A.)
Once cables have been installed, rotate General Assembly (G.A.), to ensure cables are routed
properly and do not interfere with azimuth rotation.
Fig. 6 – Inside view.
5.0
Records. N/A.
6.0
Training. N/A
7.0
References.
Strain relief assembly drawing (P/N: 124903)
Template drawing (P/N 132234)
Summary of Contents for 5012-33
Page 3: ...iii RTT E Declaration Page Testing Being Conducted...
Page 4: ...iv FCC Declaration Testing Being Conducted...
Page 8: ...5012 33 Installation Manual Table of Contents viii This Page Intentionally Left Blank...
Page 20: ...5012 33 Installation Manual Site Survey 2 8 This Page Intentionally Left Blank...
Page 34: ...5012 33 Installation Manual Installation 3 14 This Page Intentionally Left Blank...
Page 44: ...5012 33 Installation Manual Setup Ship s Gyro Compass 5 4 This Page Intentionally Left Blank...
Page 54: ...5012 33 Installation Manual Setup Blockage Zones 8 2 This Page Intentionally Left Blank...
Page 64: ...5012 33 Installation Manual Quick Start Operation 10 6 This Page Intentionally Left Blank...
Page 80: ...5012 33 Installation Manual DRAWINGS 13 2 This Page Intentionally Left Blank...
Page 90: ......
Page 91: ......
Page 92: ......
Page 98: ......