
Field Service Procedure – Replacement Pol Pot Kit, 4012
Page
8
of
16
Document No
136829 Rev A
Copyright © Sea Tel, Inc 2012 - The information contained in this document is proprietary to Sea
Tel, Inc. This document may not be reproduced or distributed in any form without prior written
consent of Sea Tel, Inc.
8.
Replacing
the
4012
Pol
Pot
Assembly:
8.1.
Tools.
2.5mm
Allen
Wrench/Key
4mm
Allen
wrench/Key
Snips/Cutters
17mm
Wrench/Spanner
3mm
Allen
Wrench/Key
2mm
Flat
Blade
(Terminal)
Screwdriver
Ruler/Straight
Edge
Cable
Ties/Tie
Wraps
Loctite
242
8.2.
Procedure.
Procedure
for
replacing
the
pol
pot,
Sea
Tel
kit
part
number:
136741
(pol
pot
part
number:
115425
‐
6).
*Caution:
Power
down
the
pedestal
before
following
this
procedure.
1.
Using
a
2.5mm
Allen
wrench
remove
the
four
screws
securing
the
feed
horn
to
the
front
of
the
reflector
and
remove
the
feed
horn.
Save
the
hardware
for
futures
use.
2.
Disconnect
the
military
spec
connector
from
its
socket
to
allow
access
to
the
screws
to
remove
the
upper
bracket.
3.
Remove
the
5
screws
which
securing
the
mounting
plate
with
the
cannon
connection
and
IDC
connection
PCB
to
the
RF
cage.
Retain
the
hardware
for
future
use.
*Note:
The
mounting
plate
will
remain
attached
to
the
harness
while
the
RF
cage
is
removed
from
the
rear
of
the
reflector.
Summary of Contents for 4012
Page 1: ......