
Field Service Procedure – Replacement Pol Pot Kit, 4012
Page
15
of
16
Document No
136829 Rev A
Copyright © Sea Tel, Inc 2012 - The information contained in this document is proprietary to Sea
Tel, Inc. This document may not be reproduced or distributed in any form without prior written
consent of Sea Tel, Inc.
45.
Route
the
BUC
DC
power
cable
around
between
X
‐
Pol
LNB
and
the
RF
cage
and
connect
it
to
the
BUC.
46.
Sit
the
upper
bracket
on
top
of
the
RF
cage
and
reconnect
the
IDC
connectors
with
the
4
‐
pin
sensor
connector
on
the
left,
the
5
‐
pin
pot
connector
in
the
center
and
the
2
‐
pin
motor
connector
on
the
right
(as
shown
in
the
image
on
the
right).
47.
Secure
the
pot,
motor
and
sensor
harness
to
the
underside
of
the
upper
bracket
using
a
cable
tie.
48.
Using
the
hardware
removed
in
step
3
secure
the
upper
bracket
to
the
RF
cage,
tightening
with
a
4mm
Allen
wrench.
Apply
Loctite
242
to
the
threads.
49.
Reconnect
the
military
spec
connector
to
its
mounting
bracket.
Summary of Contents for 4012
Page 1: ......