3 Operation
3--26
Edge Reinforcer Issue 1
C
D
A B
Fig. 3-49. Attach Tape End to Heat Roller (Heat
Should be Off)
Step: 7.
The tape (A) should be coming off of
bottom of the roll so that the adhesive
side is facing out.
Step: 8.
Loop the tape over roller and stick the
end of the tape to the Heat Roller (B).
NOTE: The Heat must be off.
Step: 9.
Run 2--3 sheets of stock and discard
them so that the finger prints are not
showing through the tape on the
processed sheets.
Step: 10.
Loosen the set screws in the collars (C &
D) to adjust the location on the paper
where the tape is being applied.
Summary of Contents for Edge Reinforcer
Page 2: ...ISSUE NOTE This is Issue 1 Date of Issue July 2006 Copyright 2006...
Page 7: ...1 Introduction Safety 1 2 Edge Reinforcer Issue 1...
Page 16: ...2 Installation 2 1 Edge Reinforcer Issue 1 2 INSTALLATION Edge Reinforcer Issue 1...
Page 17: ...2 Installation 2 2 Edge Reinforcer Issue 1...
Page 21: ...3 Operation 3 1 Edge Reinforcer Issue 1 3 OPERATION Edge Reinforcer Issue 1...
Page 22: ...3 Operation 3 2 Edge Reinforcer Issue 1...
Page 24: ...3 Operation 3 4 Edge Reinforcer Issue 1...
Page 50: ...4 Maintenance 4 1 Edge Reinforcer Issue 1 4 MAINTENANCE Edge Reinforcer Issue 1...
Page 51: ...4 Maintenance 4 2 Edge Reinforcer Issue 1...
Page 68: ...Page 5 4 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 1 Base Assembly...
Page 70: ...Page 5 6 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 2 Base Assembly...
Page 82: ...Page 5 18 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 8 Cover Assembly...
Page 102: ...Page 5 38 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 18 Housing Assembly...
Page 104: ...Page 5 40 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 19 Sprocket Mounting Assembly...
Page 112: ...Page 5 48 5 Parts Scott Edge Reinforcer Issue 1 07 2006 5 23 Leg Extension Assembly...