GE 2000 A.R.S.
4
D.
Adjust the selectable relief pressure: press for 3 seconds the
MAX
button, the display starts flashing. With
SET
+ and
SET-
you can adjust the value. After 2 seconds the display stops flashing and the set pressure is stored. There is the possibility
to adjust the relief pressure from 30 to 70 mbar with respect to the working pressure. Example: if the desired pressure is
set to 250 mbar and the value of discharging is set to 50 mbar, when the pressure of the inflatable structure rises to above
300 mbar, the ARS
’s discharging valve opens and the ARS’s internal pressure returns to 250 mbar
E.
After adjustment press
AUTO CYCLE
: 2 LEDs light up and after 2 seconds, the ARS will inflate-refill and discharge
automatically. With the automatic cycle switched on (LEDs ON) the UNIT automatically checks the pressure of the inflatable
structure.
TROUBLESHOOTING
Problem
Possible cause
Possible Solution
GE 2000 ARS
doesn’t start
Power cord not connected
Connect the cable correctly.
Main GREEN switch OFF
Put the switch to ON.
The power cord is damaged.
Replace or repair the cable from a SCOPREGA Service
Center.
Inflator Stop
Power cord not connected
Connect the cable correctly.
Main power switch OFF
Put the switch to ON.
Over-temperature
Wait till the ARS has cooled down. Operation will resume
automatically
ACCESSORIES
Recommended accessories for your ARS are available from your dealer.
WARNING: USE OF ACCESSORIES NOT RECOMMENDED FOR THIS PRODUCT CAN BE DANGEROUS.
MADE IN ITALY by