©
2004, Satloc LLC
Page 24 | GPSteer User Guide
4. Connect the Pump hose you disconnected in Step 3 to the
Run Tee. (So, the connection runs from the Steering Unit to
the GPSteer Valve Block.)
5. Determine the length of hose you will need to connect the
Run Tee to the pump. (So, the connection runs from the pump
to the GPSteer Valve Block.)
6. Connect a hose from the Run Tee to the pump.
6. Check the
Installation
Check the installation:
Once you have completed the hydraulic connections, you must
check all of your connections.
1. Re-check all connections for tightness.
2. Install tie wraps as needed.
3. Start the tractor and inspect it for leaks.
4. Check the manual steering.
Congratulations! You have successfully installed the hydraulic
connections needed to run GPSteer. Please review “Additional
Installation Considerations” in this chapter before proceeding to
“Chapter 3: Installing the GPSteer Components.”
Warning!
Before replacing any access panels, you need to connect the
GPSteer CPU to the GPSteer Valve Block and calibrate
GPSteer. For both tasks, you will need access to the GPSteer
Valve Block.
GPSteer Installation Guide.book Page 24 Thursday, June 17, 2004 10:51 AM
Summary of Contents for Satloc GPSteer
Page 2: ...GPSteer Installation Guide book Page 2 Thursday June 17 2004 10 51 AM...
Page 6: ...GPSteer Installation Guide book Page iv Thursday June 17 2004 10 51 AM...
Page 14: ...GPSteer Installation Guide book Page 8 Thursday June 17 2004 10 51 AM...
Page 56: ...GPSteer Installation Guide book Page 50 Thursday June 17 2004 10 51 AM...
Page 76: ...GPSteer Installation Guide book Page 70 Thursday June 17 2004 10 51 AM...
Page 100: ...GPSteer Installation Guide book Page 94 Thursday June 17 2004 10 51 AM...