
TBS, TBS-LH stationary power chucks
02.00|0889073_ROTA TB-TBS-EP |en
55
9 Remove the sealing disk (5) that is held in place by hexagon
socket screws (21) and take out the O-ring (43).
10 The piston (3) can be pulled out of the chuck body (1) and the
base jaws (2) can be pulled out of the base jaw guides from
the inside, through the piston bore hole in the chuck body.
11 Clean and blow out all parts of the chuck. Check all O-rings for
possible damage and wear, and replace them if necessary.
Lubricate the cylinder chamber of the chuck with oil. The jaw
guides in the chuck body, the base jaws and the piston on the
wedge hooks are greased with LINOMAX special grease paste.
SCHUNK offers complete sealing kits for the O-rings.
Assembly
The chuck is assembled in the same way, but in reverse order.
Observe the following points when doing this:
1 The base jaws (2), the base jaw guides in the chuck body (1)
and the hardened reversible jaws are all numbered 1, 2, and 3.
Insert the base jaws (2) in the corresponding guides to achieve
the same run-out accuracy.
NOTE
The piston wedge hook with the dot marking on the inside is
aligned using jaw guide 1.
2 Allow the piston with the O-rings (40) to snap into the base
jaw wedge hooks (2) and push it in up to the end of the stroke.
3 Insert the O-ring (43) and sealing disk (5) with O-ring (42) and
screw them into the chuck body securely and air-tight using
the hexagon socket screws (21).
4 Push the piston cover (6) with O-ring (41) into the piston (3)
and tighten the hexagon socket screws (25).
5 Place the chuck on the chuck mount with O-rings (39, 44) and
fasten it with hexagon socket screws (23).
6 Lubricate the valve system (13) and valve bore hole with oil,
install the valve system, and seal it with the locking screw (15)
and O-ring (37).
7 Insert the guide bushing (4) from the front side of the chuck
and fasten it tightly using the hexagon socket screws (20).
8 Before inserting the profile ring seals (47) in the slots in the
distributor ring, rub them with grease by hand so that they
remain elastic. There must be no visible grease residue.
When re-inserting the profile ring seals (47), ensure the that
10.1.2
Summary of Contents for ROTA EP 380-127
Page 64: ...Assembly drawings 64 02 00 0889073_ROTA TB TBS EP en Assembly drawings TB 400 850 16 ...
Page 66: ...Assembly drawings 66 02 00 0889073_ROTA TB TBS EP en TB 400 850 LH ...
Page 67: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 67 X Clamping stroke TB 1000 LH ...
Page 68: ...Assembly drawings 68 02 00 0889073_ROTA TB TBS EP en ...
Page 69: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 69 EP LH ...
Page 70: ...Assembly drawings 70 02 00 0889073_ROTA TB TBS EP en ...