
Commissioning and maintenance
50
02.00|0889073_ROTA TB-TBS-EP |en
1 Mounted directly from front: 2 bore
holes Ø L, depth C4
7 Required distance for removing the
tank
2 Lateral mounting with two retaining
brackets (accessories)
8 Automatic condensate drain can be
connected using a hose with I.D. 6
3 Protective metal cage with transparent
polycarbonate tank
9 Pressure gauge, Ø 40
4 Fill level indicator for condensate
(small inspection window)
10 Protective cage lock
5 Fill level indicator for oil – min./max.
(large inspection window)
11 Distributor module as accessory: with
two connections (Ø T) at front and rear
and one ready-fitted seal plug
6 Semi-automatic condensate drain, G
1/8 connection
Ø W
G 1/4”
D
84
K
10
Tank
7 cl
D1
42
K1
28
A
125
E
89
Ø L
4.1
W
213
E1
65
Ø L1
4.5
B1
-
F
21
M
3
C
42
F1
40
Ø T
G 1/8”
Summary of Contents for ROTA EP 380-127
Page 64: ...Assembly drawings 64 02 00 0889073_ROTA TB TBS EP en Assembly drawings TB 400 850 16 ...
Page 66: ...Assembly drawings 66 02 00 0889073_ROTA TB TBS EP en TB 400 850 LH ...
Page 67: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 67 X Clamping stroke TB 1000 LH ...
Page 68: ...Assembly drawings 68 02 00 0889073_ROTA TB TBS EP en ...
Page 69: ...Assembly drawings 02 00 0889073_ROTA TB TBS EP en 69 EP LH ...
Page 70: ...Assembly drawings 70 02 00 0889073_ROTA TB TBS EP en ...