Assembly
24
10.00 | PGN-plus-P | Assembly- and Operating Manual | en | 389753
Air connections
1
Main connections (Hose connection)
(A = open, B = close)
2
Hose-free direct connection at the base
(a = open, b = close)
3
Hose-free direct connection
4
Air purge connection
Hose-free direct connection
6
Product
7
O-ring
8
Attachment
• Open only the air connections that are needed.
• Close unused main air connections using the screw plugs from
the enclosed pack.
• For a hose-free direction connection, use the O-rings from the
enclosed pack.
Item Mounting
PGN-plus-P
40
50
64
80
100 125
1
Thread in the main air
connections
M3 M5 M5 M5 G1/
8
G1/
8
Max. depth of engagement
from locating surface [mm]
4
5
6
6
7
7
2
Thread in the air purge
connection
M3 M3 M5 M5 M5 M5
Max. depth of engagement
from locating surface [mm]
3.9
5
6
6
6
6