Assembly
10.00 | PGN-plus-P | Assembly- and Operating Manual | en | 389753
23
Connections for
additional structure
Connections at the housing, sizes: A - to 100, B - from 125
Item Mounting
PGN-plus-P
40
50
64
80
100 125
1
Thread in the housing
M2 M2.
5
M2.
5
M2.
5
M3 M4
Max. depth of engagement
from locating surface [mm]
5
7.1
7.1
7.1
8.4 10.9
2
Centering sleeve
Ø3
Ø4
Ø4
Ø4
Ø5
Ø6
Item Mounting
PGN-plus-P
160
200
240
300
380
1
Thread in the housing
M5
M6
M6
M8
M10
Max. depth of engagement
from locating surface [mm]
13
12
12
12
16
2
Centering sleeve
Ø8
Ø10
Ø10
Ø12
Ø14
5.2.2 Pneumatic connection
NOTE
• Observe the requirements for the compressed air supply,
17].
• In case of compressed air loss (cutting off the energy line), the
components lose their dynamic effects and do not remain in a
secure position. However, the use of a SDV-P pressure mainten-
ance valve is recommended in this case in order to maintain the
dynamic effect for some time. Product variants are also offered
with mechanical gripping force via springs, which also ensure a
minimum clamping force in the event of a pressure drop.