OPERATION
SRW1000 08/17
Operation Section 4-13
© 2017 Alamo Group Inc.
OPERA
T
ION
9.2 Windrower Pre-Operation Inspection/Service
Before each implement use, a complete inspection and service is required to ensure the implement is in a
good and safe working condition. Damaged and/or broken parts should be repaired and/or replaced
immediately. To ensure the implement is ready for operation, conduct the following.
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
9.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
Summary of Contents for SRW1000
Page 4: ......
Page 7: ...Safety Section 1 1 2017 Alamo Group Inc SAFETY SECTION ...
Page 19: ...SAFETY SRW1000 08 17 Safety Section 1 13 2017 Alamo Group Inc SAFETY Decal Location ...
Page 21: ...SAFETY SRW1000 08 17 Safety Section 1 15 2017 Alamo Group Inc SAFETY Decal Description ...
Page 22: ...SAFETY SRW1000 08 17 Safety Section 1 16 2017 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY SRW1000 08 17 Safety Section 1 17 2017 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY SRW1000 08 17 Safety Section 1 18 2017 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY SRW1000 08 17 Safety Section 1 19 2017 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY SRW1000 08 17 Safety Section 1 20 2017 Alamo Group Inc SAFETY ...
Page 28: ......
Page 29: ...Introduction Section 2 1 2017 Alamo Group Inc INTRODUCTION SECTION ...
Page 32: ......
Page 33: ...Assembly Section 3 1 2017 Alamo Group Inc ASSEMBLY SECTION ...
Page 45: ...Operation Section 4 1 2017 Alamo Group Inc OPERATION SECTION ...
Page 81: ...Maintenance Section 5 1 2017 Alamo Group Inc MAINTENANCE SECTION ...
Page 90: ......
Page 93: ......