ASSEMBLY
SRW1000 08/17
Assembly Section 3-12
© 2017 Alamo Group Inc.
ASSEMBL
Y
PRE-DELIVERY CUSTOMER CHECKLIST
Is oil level in the gearboxes to correct level?
Has the proper oil been used in the Gearboxes?
Are the Tires clear of the Mainframe?
Are all hoses tight and do not leak?
Are all decals in place? See manual for decal description and placement?
Are all bolts tight?
Have all hoses been properly routed so that hoses do not kink or bind when windrower is
articulated through all motions?
Is machine equipped with proper operator protection
Is drum rotation correct? Are teeth hard surfaced?
Does implement operate smoothly at normal operating speed? Implement should not
vibrate excessively.
Summary of Contents for SRW1000
Page 4: ......
Page 7: ...Safety Section 1 1 2017 Alamo Group Inc SAFETY SECTION ...
Page 19: ...SAFETY SRW1000 08 17 Safety Section 1 13 2017 Alamo Group Inc SAFETY Decal Location ...
Page 21: ...SAFETY SRW1000 08 17 Safety Section 1 15 2017 Alamo Group Inc SAFETY Decal Description ...
Page 22: ...SAFETY SRW1000 08 17 Safety Section 1 16 2017 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY SRW1000 08 17 Safety Section 1 17 2017 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY SRW1000 08 17 Safety Section 1 18 2017 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY SRW1000 08 17 Safety Section 1 19 2017 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY SRW1000 08 17 Safety Section 1 20 2017 Alamo Group Inc SAFETY ...
Page 28: ......
Page 29: ...Introduction Section 2 1 2017 Alamo Group Inc INTRODUCTION SECTION ...
Page 32: ......
Page 33: ...Assembly Section 3 1 2017 Alamo Group Inc ASSEMBLY SECTION ...
Page 45: ...Operation Section 4 1 2017 Alamo Group Inc OPERATION SECTION ...
Page 81: ...Maintenance Section 5 1 2017 Alamo Group Inc MAINTENANCE SECTION ...
Page 90: ......
Page 93: ......