Operating Manual
V
ACU
M
ASTER
VHB 250-500
Chapter 5
Operating
J. Schmalz GmbH
Aacher Straße 29
D - 72293 Glatten
Tel +49 +7443 / 2403 - 0
Fax +49 +7443 / 2403 - 259
http://www.schmalz.de
e-mail: [email protected]
BA 30.30.01.00223
Status 03.2013 / Index 00
Page 12 / 16
5.2 Lifting Loads
Switch the lifting device on.
Position the lifting device directly above the load. Do not pull to the sides.
Distribute load evenly.
Put lifting device down on the load. Ensure that all suction pads are
attached to the load.
Shift bushing on the slide valve in position “Suck on“ resp. press the button „
Suck on“ (device with solenoid valve).The load attaches to the suction pad.
Watch the pressure gauge. As soon as a vacuum pressure of -0.6 bar has
been reached you can lift the load. By no means lift the load before.
It would fall off.
When lifting be sure to lift only one piece of the items to be lifted. Before lifting,
carefully remove other pieces sticking below to the one you want to lift. Use a
screwdriver to do that. Do not separate them with your hands. Severe bruises!
5.3 Lowering Loads
Lower the load to a safe and vacant, level surface, to ensure that the load
cannot slip or tip over.
Shift the bushing on the slide valve back in position “Release“ resp. press the
button “Release“ (device with solenoid valve). The load is released.
5.4 Moving the Lifting
Device with the
Chain Hoist
Do not jerkily drive the lifting device because the device with the sucked on load
could get in rotation or pendulum motion.
Accident hazard !