Schmalz Blower Box SBB Operating And Maintenance Instructions Manual Download Page 14

INSTALLATION 

14 |   EN 

www.schmalz.com 

30.30.01.00159/01 

Installation 

 

Please read section 1.6 (Requirements & instructions for installation, 
maintenance and operating staff) before starting installation. 

5.1  Mounting with vacuum pump 

Tools required: 

 

Allen key, size 5 

 

Wrench in size 10, 25, 32, 36  

 

Alternatively pipe wrench (for size 32 and size 36) 

 

 

Image 

Work step description 

 

1.  Remove the cover from the 

Schmalz Blower Box.  

2.  Position the base plate at the 

intended installation location. 

Important:

 If the Schmalz Blower Box is 

used, the vacuum pump may only be 
installed in a horizontal position. The base 
plate must be securely connected to the 
support with 4 screws. 
Exception: The blower does not have to be 
secured for floor mounting. 

 

Remove the cover from the Schmalz Blower 
Box.  

 

 

Drilling template for EVE-TR 25 (1) 
Drilling template for EVE-TR 40 / 50 (2) 

Summary of Contents for Blower Box SBB

Page 1: ...www schmalz com Ergonomic Handling Solutions EN Operating and maintenance instructions Schmalz Blower Box SBB 30 30 01 00159 01 03 2016...

Page 2: ...retains the rights established thereby Reproduction of the contents in full or in part is only permitted within the limits of the legal provisions of copyright law Any modifications to or abridgments...

Page 3: ...t Description 10 2 1 Schmalz Blower Box components 10 2 2 Type plate 10 3 Technical Data 11 4 Delivery Packaging and Transport 12 4 1 Delivery 12 4 2 Packaging 12 4 3 Transport with mounted vacuum gen...

Page 4: ...g This warning informs the user of a risk that could result in death or serious injury if it is not avoided WARNING Type and source of danger Consequence Remedial action Caution This warning informs t...

Page 5: ...l Description General warning symbol Explosive atmosphere Electrical voltage Flying debris Hot surfaces 1 3 Mandatory symbols Explanation of the mandatory symbols used in the operating and maintenance...

Page 6: ...the installation maintenance and repair work Qualified specialist personnel are persons who have received technical training and have the knowledge and experience including knowledge of applicable reg...

Page 7: ...ment must be carried out by qualified electrical specialists only A qualified employee is defined as an employee who has received technical training and has the knowledge and experience including know...

Page 8: ...ature must lie within a range of 0 C to 40 C the components are installed or stored in a dry state and must be protected from splashing or dripping water no small parts can enter the exhaust air or ai...

Page 9: ...jury All vacuum generators generate an exhaust air flow Depending on the purity of the ambient air this exhaust air can contain particles which escape from the exhaust air outlet at high speed potenti...

Page 10: ...ose duct 2 Cover 5 Exhaust air channel external ventilator for V model 3 Cable connection 2 2 Type plate The device type device number and year of manufacture are specified on the type plate This info...

Page 11: ...650 Width mm 575 Height mm 565 Weight kg 27 7 without vacuum generator may vary depending on the design For the vacuum pump EVE TR 40 50Hz the silencer box enables a reduction in the noise emissions...

Page 12: ...rted either in a cardboard box or wooden crate or on a pallet The packaging material must be disposed of in accordance with country specific laws and guidelines Labeled transport aids and safety mecha...

Page 13: ...AND TRANSPORT 30 30 01 00159 01 www schmalz com EN 13 CAUTION Load suspension outside the center of gravity May cause damage to the screw union between pump and metal tray Sudden and incorrect lifting...

Page 14: ...2 and size 36 Image Work step description 1 1 Remove the cover from the Schmalz Blower Box 2 Position the base plate at the intended installation location Important If the Schmalz Blower Box is used t...

Page 15: ...acuum hose without voltage through the opening in the front side of the base tub 3 Attach the vacuum hose to the suction supports with a hose clamp 4 Mount optional dust filter see section 5 4 6 1 Att...

Page 16: ...2 Fit motor sleeve over motor 3 1 Fit additional sound absorber with the large bore hole over the exhaust air silencer 2 Ensure that the foam insert contacts the housing wall of the sound absorber cor...

Page 17: ...commissioning Check whether the exhaust air exits from the side of the base plate when the blower is switched on No exhaust air should enter the interior from the blower silencer 9 1 Place the cover...

Page 18: ...3 Installing on a blower console 5 3 1 Vacuum pump 5 3 2 Vacuum blower Installation as for vacuum pump See also mounting instructions for blower console 30 30 01 00881 Installation on the blower cons...

Page 19: ...rations check that the vacuum generator rotation direction corresponds with that in the operating instructions provided separately Ensure that the Schmalz Blower Box is securely screwed to the support...

Page 20: ...Description of Operation The Schmalz Blower Box allows the noise emissions caused by the vacuum generator to be reduced to a minimum The cover must be properly closed during the operation of the vacu...

Page 21: ...Switch off the vacuum generator and disconnect from the electrical voltage 2 Remove the vacuum supply hose 8 2 Disposal Only qualified specialist personal may prepare the Schmalz Blower Box for dispos...

Page 22: ...and maintenance instructions and CAD data and get comprehensive information about our products and services www schmalz com dokumentationen How to videos In short easy to understand videos we explain...

Reviews: