5
– FUNCTIONING AND USE
COD: 500M380.D.2018
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
41
4. Close the depressurization valve when the display
shows the specific message and wait for the
completion of the procedure.
5.5 Normal operating procedure
Please, be sure to perform all the following checks before proceeding normal operating procedure:
1. Be sure the reset valve is closed (lever
orthogonal
to the body valve) and the positioner completely
unscrewed.
2. Be sure the depressurization valve is closed.