![Scag Power Equipment CHEETAH II Operator'S Manual Download Page 3](http://html.mh-extra.com/html/scag-power-equipment/cheetah-ii/cheetah-ii_operators-manual_1205794003.webp)
I
R
Table of Contents
Table of Contents
NOTES .............................................................................................................................................................. IV
SECTION 1 - GENERAL INFORMATION ...................................................................................1
1.1 INTRODUCTION ...........................................................................................................................................1
1.2 DIRECTION REFERENCE ...........................................................................................................................1
1.3 SERVICING THE ENGINE AND DRIVE TRAIN COMPONENTS .................................................................1
1.4 SYMBOLS ....................................................................................................................................................2
SECTION 2 - SAFETY INFORMATION ......................................................................................3
2.1 INTRODUCTION ...........................................................................................................................................3
2.2 SIGNAL WORDS ..........................................................................................................................................3
2.3 BEFORE OPERATION CONSIDERATIONS ................................................................................................3
2.4 TESTING THE SAFETY INTERLOCK SYSTEM ..........................................................................................4
2.5 OPERATION CONSIDERATIONS ................................................................................................................5
2.6 ROLL-OVER PROTECTION SYSTEM .........................................................................................................6
2.7 MAINTENANCE CONSIDERATIONS & STORAGE ....................................................................................8
2.8 USING A SPARK ARRESTOR .....................................................................................................................9
2.9 SPARK IGNITION SYSTEM .........................................................................................................................9
2.10 SAFETY AND INSTRUCTIONAL DECALS .............................................................................................10
SECTION 3 - SPECIFICATIONS ..............................................................................................11
3.1 ENGINE ......................................................................................................................................................11
3.2 ELECTRICAL .............................................................................................................................................11
3.3 POWER HEAD ...........................................................................................................................................11
3.4 CUTTER DECK ..........................................................................................................................................12
3.5 HYDRAULIC SYSTEM ...............................................................................................................................12
3.6 WEIGHTS AND DIMENSIONS ...................................................................................................................12
3.7 PRODUCTIVITY .........................................................................................................................................12
SECTION 4 - OPERATING INSTRUCTIONS ...........................................................................14
4.1 TIGER EYE INSTRUMENT IDENTIFICATION ...........................................................................................14
4.2 CONTROLS IDENTIFICATION ..................................................................................................................16
4.3 SAFETY INTERLOCK SYSTEM ................................................................................................................17
4.4 TESTING THE SAFETY INTERLOCK SYSTEM ........................................................................................17
4.5 INITIAL RUN-IN PROCEDURES ................................................................................................................17
4.6 STARTING THE ENGINE ...........................................................................................................................17
4.7 GROUND TRAVEL AND STEERING .........................................................................................................18
4.8 ENGAGING THE DECK DRIVE (CUTTER BLADES) ................................................................................19
4.9 HILLSIDE OPERATION ..............................................................................................................................19
4.10 PARKING THE MOWER ...........................................................................................................................20
4.11 AFTER OPERATION ................................................................................................................................20
4.12 REMOVING CLOGGED MATERIAL ........................................................................................................20
4.13 MOVING MOWER WITH ENGINE STOPPED ..........................................................................................20
Summary of Contents for CHEETAH II
Page 6: ...IV R Table of Contents NOTES ...
Page 19: ...13 R Section 3 ...
Page 51: ...45 R Section 8 NOTES ...
Page 63: ...57 R Section 8 NOTES ...
Page 74: ...68 R Section 8 SCZII HYDRAULIC SYSTEM 1 4 4 4 6 6 7 4 5 A A B B 2 2 3 3 3 3 7 ...
Page 78: ...72 R Section 8 SCZII ENGINE ATTACHING PARTS 1 2 3 4 1 1 8 7 9 6 5 10 14 11 12 13 ...
Page 90: ... 2020 Scag Power Equipment Division of Metalcraft of Mayville Inc ...