Savant Power System Deployment Guide - Sol-Ark
Copyright 2022 Savant Systems, Inc
009-2222-01 | 121222
- 31 -
Advanced Setting
Gen peak-shaving
DIS
Gen peak-shaving power(1000-
16000W)
8000
Grid peak-shaving
DIS
DRM
DIS
Backup Delay (0-300S)
49
CT ration(200-8000)
2000 : 1
Grid peak-shaving power(1000-
16000W)
8000
Parallel
DIS
Equipment mode
Master
Modbus SN(1-16)
1
Phase
A
Auto Detect Home Limit Sensors
DIS
Bms_Err_Stop
DIS
Grid Setting
Grid Mode
UL1741SA
PF
1
Reconnection Time(1-600S)
30
Grid Frequency
60
Grid Type
120/240 Split phase
Grid Vol High(180.0-270.0V)
265
Grid Vol Low(180.0-270.0V)
185
Grid HZ High(45.00-65.00Hz)
62
Grid Hz Low(45.00-65.00Hz)
57
Inverter output voltage(V)
120/240V
Zero export power(0~500W)
20
GEN connect to Grid input
DIS
L/HVRT
DIS
L/HFRT
ENA
HF2 (45-65HZ)
62
HF1 (45-65HZ)
60.5
LF1 (45-65HZ)
58.5
LF2 (45-65HZ)
57
HF2 Time (0-300S)
0.16
HF1 Time (0-300S)
299
LF1 Time (0-300S)
299
LF2 Time (0-300S)
0.16
Q(V)
DIS
FW
DIS
VW
DIS
Normal Ramp rate(1-100%/s)
10
Soft Start Ramp rate(1-100%/s)
10
DC 1 for WindTurbine
DIS
DC 2 for WindTurbine
DIS