Chapter 5 Configuring the EM720
General Meter Setup
74
EM720 Power Quality and Revenue Meter
The order in which you define the test points does not
matter. The meter will automatically arrange all data in a
correct order.
Check the Correction Enabled box to activate transformer
correction in the meter. You can also enable and disable
transformer correction from the front display (see
Transformer/Line Loss Compensation Setup
Loss compensation corrects the power and energy readings of
the meter when the metering point and point of billing are
physically separated by a power transformer or a power line.
Select General Setup from the Meter Setup menu, and then
click on the Transformer/Line Loss Compensation tab.
The available options are described in the following table.
Parameter Options
Description
Metering and Location
Loss Compensation Enabled
Disabled, Enabled
Enables/disables loss compensation
Metering Point Location
Supply side, far end,
Supply side,
transformer end,
Load side,
transformer end,
Load side, far end
Defines the location of the meter:
far end – near the supply source or near the load,
transformer end – near the power transformer.