23
BALL BEARINGS.
All the ball bearings are already lubricated
with grease and so it isn’t necessary further
lubrication.
3.6.2. MECHANICAL PREARRANGEMENT.
Take away, with cleaning liquids, impurities
and antioxidant grease eventually spread
on the machine parts not covered.
Assemble the charge belt conveyor on the
machine by connecting the fixing plate FP
(photo 3.6) to the connecting area CA with
bolts (photo 3.7).
PHOTO 3.6
PHOTO 3.7