![Sartorius MA45 Operating Instructions Manual Download Page 8](http://html1.mh-extra.com/html/sartorius/ma45/ma45_operating-instructions-manual_1199628008.webp)
Leveling the Moisture Analyzer
Purpose:
– To compensate for unevenness at the place of installation
– This is necessary especially for testing liquid samples that need to be at a uniform level
in the disposable sample pan
Always level the moisture analyzer again any time after it has been moved to a
different location.
§
Extend or retract the front and/or rear leveling feet as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional)
!
To prevent burns, allow the glass panels to cool sufficiently before removing them
!
Do not handle the aluminum panels with oily or greasy fingers
!
Do not scratch the aluminum panels; do not use abrasive or corrosive substances to clean
the aluminum panels
§
Remove the 6 screws and remove the panel retainer
§
Remove the glass panels
§
Position the aluminum panels in the retainer
§
Fasten the aluminum panels with the retainer and screws
Turning On the Analyzer; Opening and Closing the Sample Chamber
§
To turn on the analyzer: Press the
e
key
§
When opening or closing the sample chamber: Do not release the cover until it is in the fully
open or fully closed position
Setting the Language
– See “Setting the Language” in the chapter entitled “Configuring the Moisture Analyzer”
8